SL Tittle Tender Number Department Last Date of Submission Open Date EMD Corrigendum
411

Upkeeping of BDC Building for the Period 2023-2025

CIVIL/CE(C)/EE(C)/19/2023-24 Civil Dept 42,100.00
Attachment Size
BDCUpkeepingTD.pdf 3.83 MB
NIT_Letter.pdf 26.32 KB
412

Raising of Kerb wall in the Median of the Main Road to NMP Colony.

CIVIL/CE(C)/EE(C)/17/2023-24 Civil Dept 12,500.00
Attachment Size
ColonyRoadKerbTD.pdf 1.37 MB
NIT_Letter (1).pdf 26.32 KB
413

Comprehensive Maintenance Contract for Fire Alarm, Smoke Detection System, CCTV, Biometric Access Control System installed at NMPA Data Center.

8/3/2023/Ele. Dvn/EQ/06/02 Mechanical Dept
Attachment Size
Enquiry -CMC for Fire Alarm, Smoke Detection, CCTV, Biometric Access Control System installed at NMPA Data Center (1).pdf 819.06 KB
414

Development of garden in front of weigh bridge No.2 and south side of main road connecting to Mallya gate near New shed No.3

.21/92/MTC-II/2023-TS Dtd.21.06.2023 Civil Dept 3,700.00
Attachment Size
doc01111720230626192502.pdf 1.38 MB
415

Providing Rock Wool insulation with mesh horizontal/vertical wrapped with Aluminium sheet of 24 gauge to Engine Exhaust/silencer Pipeline Connected to Cummins Engines coupled to Fire water Monitor & Hydrant Pumps at FPH No.1 of Berth No.10

20/114/2023-24/EE(M)III-TS(OTM) Mechanical Dept
Attachment Size
Providing Rock Wool insulation with mesh.pdf 887.48 KB
416

Arrangements for flex in connection with the visit of Hon'ble Secretary MoPSW to NMPA

22/121/MTC-II/2023-TS Dtd.23.06.2023 Civil Dept
Attachment Size
doc01109620230626170651.pdf 727.75 KB
417

Supply, installation, testing & commissioning of Fire Alarm System to Pass Section.

2/FireAlarm/EE(E)II/2023 Mechanical Dept
Attachment Size
2RFQ FireAlarm PaScn23.docx 44.5 KB
418

Replacement of corroded barbed wire fencing provided to garden from Mallya gate to railway level crossing parallel to service road.

21/89/MTC-II/2023-TS Dtd.20.06.2023 Civil Dept 1,850.00
Attachment Size
doc01100420230623120533.pdf 1.83 MB
419

Providing PVC false celing to the pharmacy and painting the various Medical Equipments/items in NMPA Hospital.

5/307/CIVIL/Mtc-I/2023-TS dated 22.06.2023 2450
Attachment Size
PVC False Ceiling.pdf 533.46 KB
420

Hydraulic Network analysis of Fire Fighting network/ facilities provided at oil berth no.10 at New Mangalore Port Authority

EE(M)II/2022-23/Hydraulic Analysis. Dated 22.06.2023. Mechanical Dept Corrigendum 1 updated on 07-07-2023 for extending the last submission date till 13-07-2023 15:00hrs. Corrigendum 2 updated on 17-07-2023 for extending the last submission date till 21-07-2023 15:00hrs
Attachment Size
Enquiry Dated 22.06.2023 for Hydraulic Analysis.pdf 1.67 MB
CORRIGENDUM-1.pdf 524.03 KB
CORRIGENDUM-2.pdf 523.35 KB